Single-machine scheduling with an external resource

06/05/2020
by   Dirk Briskorn, et al.
0

This paper studies the complexity of single-machine scheduling with an external resource, which is rented for a non-interrupted period. Jobs that need this external resource are executed only when the external resource is available. There is a cost associated with the scheduling of jobs and a cost associated with the duration of the renting period of the external resource. We look at four classes of problems with an external resource: a class of problems where the renting period is budgeted and the scheduling cost needs to be minimized, a class of problems where the scheduling cost is budgeted and the renting period needs to be minimized, a class of two-objective problems where both, the renting period and the scheduling cost, are to be minimized, and a class of problems where a linear combination of the scheduling cost and the renting period is minimized. We provide a thorough complexity analysis (NP-hardness proofs and (pseudo-)polynomial algorithms) for different members of these four classes.

READ FULL TEXT

Please sign up or login with your details

Forgot password? Click here to reset
Success!
Error Icon An error occurred

Sign in with Google

×

Use your Google Account to sign in to DeepAI

×

Consider DeepAI Pro