Improved Approximations for Unrelated Machine Scheduling

11/18/2022
∙
by   Sungjin Im, et al.
∙
0
∙

We revisit two well-studied scheduling problems in the unrelated machines setting where each job can have a different processing time on each machine. For minimizing total weighted completion time we give a 1.45-approximation, which improves upon the previous 1.488-approximation [Im and Shadloo SODA 2020]. The key technical ingredient in this improvement lies in a new rounding scheme that gives strong negative correlation with less restrictions. For minimizing L_k-norms of machine loads, inspired by [Kalaitzis et al. SODA 2017], we give better approximation algorithms. In particular we give a √(4/3)-approximation for the L_2-norm which improves upon the former √(2)-approximations due to [Azar-Epstein STOC 2005] and [Kumar et al. JACM 2009].

READ FULL TEXT

Please sign up or login with your details

Continue with:
Or login with email
Enter Password
Re-enter Password

Forgot password? Click here to reset
Success!
Error Icon An error occurred

Sign in with Google

×

Use your Google Account to sign in to DeepAI

×
Pro

Consider DeepAI Pro

Subscribe to DeepAI Pro
DeepAI Pro
Provides a limited generation allowance each month. When exceeded, you are charged overage rates available at deepai.org/pricing. Also includes an ad-free experience and API access. Renews automatically until canceled. Non-refundable.
Subtotal
Total due today

Payment

Add DeepAI credits
DeepAI credits
One-time purchase. Credits are added to your wallet after payment.
Subtotal
Total due today

Payment