Use of Bayesian Network characteristics to link project management maturity and risk of project overcost

09/18/2020
by   Felipe Sanchez, et al.
0

The project management field has the imperative to increase the project probability of success. Experts have developed several project management maturity models to assets and improve the project outcome. However, the current literature lacks of models allowing correlating the measured maturity and the expected probability of success. This paper uses the characteristics of Bayesian networks to formalize experts' knowledge and to extract knowledge from a project overcost database. It develops a method to estimate the impact of project management maturity on the risk of project overcost. A general framework is presented. An industrial case is used to illustrate the application of the method.

READ FULL TEXT

page 1

page 2

page 3

page 4

research
01/14/2021

A Perspective-Based Understanding of Project Success

Answering the call for alternative approaches to researching project man...
research
05/02/2020

Visualization of Diseases at Risk in the COVID-19 Literature

This paper presents a project, named VIDAR-19, able to extract automatic...
research
07/07/2020

Data-driven Risk Management for Requirements Engineering: An Automated Approach based on Bayesian Networks

Requirements Engineering (RE) is a means to reduce the risk of deliverin...
research
03/28/2022

Extracting Image Characteristics to Predict Crowdfunding Success

Despite an increase in the empirical study of crowdfunding platforms and...
research
10/18/2017

Measuring the unmeasurable - a project of domestic violence risk prediction and management

The prevention of domestic violence (DV) have aroused serious concerns i...
research
04/01/2019

Risk management in design process for Factory of the future

The current globalization is faced to the rapid development of product d...

Please sign up or login with your details

Forgot password? Click here to reset